Design of penstock pipe for a hydroelectric pumped storage station

Cancelado Publicado Nov 16, 2011 Pagado a la entrega
Cancelado Pagado a la entrega

The task posed in this case study is to choose between two candidate steels for the construction of pressure pipes within a hydroelectric pumped storage power station. Having selected the steel, you are required to specify the wall thickness of the pipe given the internal pipe diameter, load history, design life and non-destructive inspection limitations. Each student will have a slightly different set of parameters to work with. Your report should include the design decision that you have made complete with full justification of that decision and recommendations on inspection intervals.

## Deliverables

Detectable falw size= 3mm Pipe diameter= [url removed, login to view] Static head of water= 550m Max head of water during hammer= 750m

Ingeniería

Nº del proyecto: #3700462

Sobre el proyecto

Proyecto remoto Activo Dec 9, 2011